Construction Bids/SOQs

Please click here to view the MSCAA Master Plan.

SOQs



Construction



Bid Name Date Issued Bid Opening Download
Bid: DeWitt Spain Hangars Siding Replacement
Project # 11-1334-07
05/13/2013 06/20/2013
2:00 pm
Local Time
See below
Addendum 1:
Please click here to download Addendum 1.
Drawing:
Please click here to download the Drawing referenced in Addendum 1.
Mandatory Meeting:
A MANDATORY Pre-Bid Meeting was held Tuesday, June 4, 2013, at 9:00 AM at the General DeWitt Spain Airport, 2787 North Second Street, Memphis, Tennessee 38127.

Only Prime Contractors who were in attendance the Pre-Bid Meeting will be permitted to submit a bid. The project site was available for inspection immediately following the meeting.

Sign-In Sheets:
Please click here to download the Sign-In Sheets.

Agenda:
Please click here to download the Pre-Bid Agenda.
Bid Documents:
Please click here to download the Proposal Package.
Please click here to download the Specifications.
Please click here to download the Drawings.
Legal Notice:
Please click here to download the legal notice.

Bid Name Date Issued Bid Opening Download
Bid Name
Bid: Replacement of Power Distribution Equipment
Project # 10-1306-02
05/24/2013 07/11/2013
2:00 pm
Local Time
See below
Addendum 1:
Please click here to download Addendum 1.
Mandatory Meeting:
A MANDATORY Pre-Bid Meeting was held Wednesday, June 12, 2013, at 9:00 AM Local Time at the Airport Project Center, 4225 Airways Boulevard, Memphis, TN 38116. Only Prime Contractors who attended the Pre-Bid Meeting will be permitted to submit a bid.

Sign-In Sheets:
Please click here to download the sign-in sheets.

Pre-Bid Agenda:
Please click here to download the Pre-Bid Agenda.
Bid Documents:
Please click here to download the Proposal Package.
Please click here to download the Specifications.
Please click here to download the Drawings.
Legal Notice:
Please click here to download the legal notice.


SMALL BUSINESS PROGRAM (“SBP”) PROJECTS
PLEASE CLICK HERE FOR INFORMATION ON MSCAA’S SMALL BUSINESS PROGRAM


Bid Name Date Issued Bid Opening Download
Bid: DeWitt Spain Airport – Common Hangars Heaters
Project # 13-1358-00
05/20/2013 07/11/2013
2:00 pm
Local Time
See below
Mandatory Meeting:
A MANDATORY Pre-Bid Meeting was held on Thursday, June 6, 2013, at 9:00 AM at the General DeWitt Spain Airport, 2787 North Second Street, Memphis, Tennessee 38127.

Only Prime Contractors who attended the Pre-Bid Meeting will be permitted to submit a bid. The project site was available for inspection immediately following the meeting.

Sign-In Sheets:
Please click here to download the Sign-In Sheets.

Pre-Bid Agenda:
Please click here to download the Pre-Bid Agenda.
Bid Documents:
Please click here to download the Proposal Package.
Please click here to download the Specifications.
Please click here to download the Drawings.
Legal Notice:
Please click here to download the legal notice.


Future Projects

De-Ice Pad(s)
Project includes design and construction of deice pad(s) for winter operations. May include a cross-field southern connector for improved taxi operations and a bridge or tunnel structure for Louis Carruthers Drive, if required. Project is currently in planning. Estimate Date of Design: T.B.D. Estimated Date of Construction: T.B.D. . Click here for sketch.

De-Ice Glycol Controls
Project includes facilities to collect, convey, and either treat or export glycol-based pollutant from deicing fluids. Project is currently in planning. Estimated Date of Design: T.B.D. Estimated Date of Construction: T.B.D. Click here for sketch.

Plough Cargo Ramp
Project includes design and construction of a new cargo ramp. Includes, but is not limited to, the following disciplines: civil, electrical, and fueling. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

Charles W. Baker Airport – Airfield Improvements
Project includes taxiway relocation and airfield lighting systems replacement. Project is currently in design. Estimated Date of Construction: 2014. Click here for sketch.

General DeWitt Spain Airport – Airfield Improvements
Project includes runway extension, taxiway relocation, airfield lighting systems replacement, and levee relocation. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

Terminal Building Seismic Retrofit
Project includes retrofit to improve the airport’s seismic resilience. Project is currently in planning. Estimated Date of Design: 2014. Estimated Date of Construction: T.B.D..

Hurricane Creek Taxiway Crossing
Project includes a reinforced concrete box culvert across Hurricane Creek designed to support aircraft loading for a taxiway crossing of the creek. Project design is complete. Estimated Date of Construction: T.B.D. Click here for sketch.