Construction Bids/SOQs

Please click here to view the MSCAA Master Plan.

SOQs

Construction

Bid Name Date Issued Bid Opening Download
Bid: Upper/Inner Structure Seismic Upgrades
Project No. 07-1235-06
05/04/12 06/14/12
2:00 PM Local Time
See Below
Mandatory Meeting:
A MANDATORY Pre-Bid Meeting will be held Thursday, May 17, 2012, at 9:00 AM Local Time at the Airport Project Center, 4225 Airways Boulevard, Memphis, TN 38116.

Only Prime Contractors who attend the Pre-Bid Meeting will be permitted to submit a bid.
Bid Documents:
Bid Documents will be available on or after May 7, 2012.

Drawings:
Please click here to download the drawings.

Geotech Report:
Please click here to download the Geotech Report.
Legal Notice:
Please click here to download the Legal Notice.

Small Business Program (“SBP”) Projects

Bid Name Date Issued Bid Opening Download
Forthcoming ** ** **

Future Projects

Airfield Maintenance Building – Widen 2 Service Bay OH Doors
Project includes reconstruction of two overhead doors at the Airfield Maintenance Facility. Scope includes demolition of existing doors, columns, and walls, installation of new doors and hardware, electrical system relocations, and reconstructive work to restore impacted columns and walls. Project is currently in design. Estimated Date of Construction: 2012.

18R Departure End EMAS
Project includes design and installation of an Engineered Materials Arresting Systems (EMAS) for the departure end of Runway 18R. Includes site engineering and preparation as well as possible relocation of the Runway 18R localizer antenna array. Project is currently in design. Estimated Date of Construction: 2013. Click here for sketch.

De-Ice Pad(s)
Project includes design and construction of deice pad(s) for winter operations. May include a cross-field southern connector for improved taxi operations and a bridge or tunnel structure for Louis Carruthers Drive, if required. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

De-Ice Glycol Controls
Project includes facilities to collect, convey, and either treat or export glycol-based pollutant from deicing fluids. Project is currently in planning. Estimated Date of Design: 2012. Estimated Date of Construction: T.B.D. Click here for sketch.

Plough Cargo Ramp
Project includes design and construction of a new cargo ramp. Includes, but is not limited to, the following disciplines: civil, electrical, and fueling. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

Automatic Door Replacement
Project includes full replacement of the exterior, automatic doors in the terminal building. Estimated Date of Construction: 2012.

CB Switchboard Replacement
Project includes full replacement of the CB switchboard for two motor control centers. MSCAA is currently seeking a qualified design team; see RFQ No. 10-1306-01 above. Estimated Date of Construction: 2013.

Motor Control Center Replacement
Project includes full replacement of several motor control centers. MSCAA is currently seeking a qualified design team; see RFQ No. 10-1306-01 above. Estimated Date of Construction: 2013.

Substation Replacement
Project includes full replacement of two substations. MSCAA is currently seeking a qualified design team; see RFQ No. 10-1306-01 above. Estimated Date of Construction: 2013.

AGIS Obstruction Surveys
Project includes obstruction surveys to meet the standards of FAA A/C 150/5300-18. Estimated Date of Surveying: 2013.

Terminal Building Seismic Retrofit
Project includes retrofit to improve the airport’s seismic resilience. Project is currently in planning. Estimated Date of Design: 2014. Estimated Date of Construction: T.B.D..

Hurricane Creek Improvements
Project includes realignment and channelization of the natural section of Hurricane Creek on airport property. Project is currently under design. Estimated Date of Construction: T.B.D. Click here for sketch.

Hurricane Creek Taxiway Crossing
Project includes a reinforced concrete box culvert across Hurricane Creek designed to support aircraft loading for a taxiway crossing of the creek. Project design is complete. Estimated Date of Construction: T.B.D. Click here for sketch.

Federal Inspection Station
Project includes building modifications to relocate the port of international entry. Estimated Date of Design: T.B.D. Estimated Date of Construction: T.B.D. Click here for sketch.